|
Seri Wawasan Bridge
|
 |
| |
This
is a cable-stayed bridge which will be a landmark in
Putrajaya. Being the main link between Precinct 2 at the Core
Island and the residential area of Precinct 8, the Seri
Wawasan will be an important link to the Mixed Development
Precinct. Categorized as a 'signature bridge' the Seri Ehsan
is also an important utility link between Precinct 8 and the
Core Island.
The concrete bridge is a combination of cable backstays and
structural steel tie back. It is a dual three lane
carriageways of total 18.6m width each comprising 3 x 3.5m
width lanes, 0.5m hard shoulder, 0.5m marginal strip. The
median is 4m wide and walkway cum cycle track width is 5.1m
giving a total width of 37.2m. The deck level varies from RL
32m to 34.5m at the centre of the bridge. |
|
 |
|